|  |  |  | |
|  |  | ||
|  |  | ||
|  |  | ||
|  |  | ||
|  |  |  |  | |
|  |   |   |   |   | 
 
  
 |  |  | |
|  |  |  | 
|  | Photo 1-14. (B-1234)  Steam expansion joint at end of north B Tunnel (UV-7) extended 14” of 12” design. | |
|  |  |  | |
|  |  | ||
|  |  | ||
|  |  | ||
|  |  | ||
|  |  |  |  | |
|  |   |   |   |   | 
 
  
 |  |  | |
|  |  |  | 
|  | Photo 1-14. (B-1234)  Steam expansion joint at end of north B Tunnel (UV-7) extended 14” of 12” design. | |
All Rights Reserved | Kirsner Consulting Engineering