| |
|
|
|
| |
|||
| |
|||
| |
|||
| |
|||
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
| |
![]() |
![]() |
|
| |
Photo 1-4. Tunnel A Utility Vault (UV) - 2 (A-1433)
Shows drip from vertical riser at UV-2 depositing calcium shown in previous picture (P1-3). |
||
| |
|
|
|
| |
|||
| |
|||
| |
|||
| |
|||
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
| |
![]() |
![]() |
|
| |
Photo 1-4. Tunnel A Utility Vault (UV) - 2 (A-1433)
Shows drip from vertical riser at UV-2 depositing calcium shown in previous picture (P1-3). |
||
All Rights Reserved | Kirsner Consulting Engineering