Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 2-15. (M-1545)

Entire 8” slip (of 8” design) extended in hot position at EJ-9. The anchor at the joint was well welded—a noticeable difference from the other welds to the west.