|  | Photo 2-17. South C Tunnel. (C-559) Slip on EJ-36 is out 10”. But Spreadsheet “Failures” indicates this is okay, slip was oversized. Click to view Failures spreadsheet in pdf format. | |
|  |  |  | |
|  |  | ||
|  |  | ||
|  |  | ||
|  |  | ||
|  |  |  |  | |
|  |   |   |   |   | 
 
  
 |  |  | |
|  |  |  | 