|
|
|
|
|
![]() |
||
|
![]() |
||
|
![]() |
||
|
![]() |
|
|
|
|
|
|
![]() |
![]() |
![]() |
![]() |

|
|
|
|
![]() |
![]() |
|
Photo 2-17. South C Tunnel. (C-559)
Slip on EJ-36 is out 10”. But Spreadsheet “Failures” indicates this is okay, slip was oversized. Click to view Failures spreadsheet in pdf format. |
|
|
|
|
|
![]() |
||
|
![]() |
||
|
![]() |
||
|
![]() |
|
|
|
|
|
|
![]() |
![]() |
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
Photo 2-17. South C Tunnel. (C-559)
Slip on EJ-36 is out 10”. But Spreadsheet “Failures” indicates this is okay, slip was oversized. Click to view Failures spreadsheet in pdf format. |
All Rights Reserved | Kirsner Consulting Engineering