| |
|
|
|
| |
|||
| |
|||
| |
|||
| |
|||
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
| |
![]() |
![]() |
| |
Photo 3-5. (B-498)
11” of 16”slip extended on south side of EJ-26. Anchor 17 to south is broken. ( See photo 3-11 ). |
|
| |
|
|
|
| |
|||
| |
|||
| |
|||
| |
|||
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
| |
![]() |
![]() |
| |
Photo 3-5. (B-498)
11” of 16”slip extended on south side of EJ-26. Anchor 17 to south is broken. ( See photo 3-11 ). |
|
All Rights Reserved | Kirsner Consulting Engineering