|  | Photo 3-7. (B-498)  8-1/2” of 16” showing on north side of EJ-26. The “Failures” spreadsheet indicates this is okay. Slip however shows evidence of corrosion. | |
|  |  |  | |
|  |  | ||
|  |  | ||
|  |  | ||
|  |  | ||
|  |  |  |  | |
|  |   |   |   |   | 
 
  
 |  |  | |
|  |  |  | 